Tuesday 11th Dec








Sorry I have been massively off the pace with the blog. This year’s build was just on the edge of being overly ambitious, we were told by the builders that a 60m sq square gazebo would take locals 5 weeks to erect so 6 days was going to be a big ask.
The main reason that we are struggling for time is that much of the timber was not prepared prior to our arrival, so it has been 2 steps forward 1 step back waiting for the materials to be ready to be used. I would like to say that the communication between us and the builders is improving but its not, there is still many trading of smiles as we try and explain ourselves through sign language.
Anyway today was a pretty good day on the build site. Today was all about the roof, continued on the roof structure for most of the day attaching all metal peices that the grass roofing will ultimately be attached to. After lunch we were able to attach the first of the grass roofing panels, each piece needed to be wire tired 3 times starting from the bottom and progressing each row up 150mm. It is monotonous work but the boys did a great job sticking to it. After a few hours work the progress was slow, the enormity of the task and the lack of remaining hours were of concern. We pushed on until about 5pm today after which we retreated to the cool of the dam. One of the advantages of finishing later is you get to watch the sunset from the dam, for me it is one of those lasting images.
Dinner was same same but I think there is a comfort that can be drawn from here, have a few constants in a very unfamiliar culture.

No comments:

Post a Comment