Sunday, December 9, 2012

Friday 7th Dec







Early start today. 6.30 for rice, chicken and eggs. Then we were all eager to get to Who Will village and start our work on the gazebo. Our ride for the week turned up and a few of our boys were not sure what to make of is. The poor little motor bike that has to pull the trailer and about 2 tonne of of us. A few jobs have been completed prior to our arrival; a dam has been dug, the land fill from that dam has leveled the space between the house and the footing for the gazebo have been poured. A communication break down (through language) meant that the wood that we are to use has not been dressed (cleaned up after it has been cut to size). This is a 2 day job and as we do not have 2 days to spare we jumped in to speed up the process.
We asked around for what else we could do in the mean time, where after we were informed that the walkway leading out to the cabana in the dam had broken. Our boys were very excited by the prospect of pulling something apart, which is exactly what they did. We replaced beams and half of the floor joists, now it is much safer for the children. The boys were great today, only to willing to get in and help out, just a shame that there were not enough jobs to go around.

No comments:

Post a Comment